Kitchen Remodeling

Kitchen Remodeling

The heart of the home, rebuilt right.

Full kitchen redesigns — cabinetry, countertops, flooring, lighting, appliance layout. We handle the design and the build so nothing falls through the cracks.

Typical range: $25,000 – $75,000 depending on scope, materials, and layout changes

4.9 • 127+ reviews

MBE / WBE Certified

Licensed & Insured

Free Estimates

What's Included

How we handle it.

Every project gets the same standard of precision — documented, communicated, and built to spec.

01

Full Kitchen Redesign

Layout changes, structural modifications, new everything. We manage the entire project from demo through final walkthrough.

02

Custom Cabinetry

Inset shakers, soft-close hardware, pull-out organizers, lazy susans. Built to order, installed with precision, in the finish you choose.

03

Countertop Installation

Quartz, granite, butcher block, marble. Templated on-site, fabricated to spec, and installed with seamless joints.

04

Flooring & Backsplash

Hardwood, LVP, tile — whatever fits the design. We handle subfloor prep, layout, and installation.

05

Lighting & Electrical

Under-cabinet LEDs, pendant fixtures, recessed cans, dedicated appliance circuits. Licensed electricians on every job.

06

Appliance Coordination

We coordinate delivery timing, rough-in specs, and final connections so your appliances fit perfectly on day one.

Common Questions

FAQ

How long does a kitchen remodel take?

A full kitchen remodel typically takes 6-10 weeks. Cabinet lead times are the biggest variable — we order early and schedule everything around the delivery date.

Can I use my kitchen during the remodel?

Not fully, but we help you set up a temporary kitchen space. We also phase the work when possible so you have access to a sink and refrigerator as long as possible.

Do you do the design or do I need a designer?

We do both. Design-build means our team handles the layout, material selection, and construction. You make the decisions — we handle the execution.

What's your cabinet lead time?

Custom cabinets typically take 4-6 weeks from order. We start the order as soon as you approve the design so they arrive on schedule.

Do you handle permits?

Yes. Electrical, plumbing, structural — we pull every required permit and schedule every inspection. You don't call the city.

Ready to get started?

Call us or request a free estimate. We answer the phone and we respond fast.

CallFree Estimate